It worked to doubled efficiency and reduced equipment costs and lift-related injuries for the nine-story hotel tower featured approx. Empirehouse entered into design-assist services with PCL Construction to assist with budgeting, pre-engineering, and the design layout anchoring of the saw-tooth curtainwall attachment.Įntering the project at the beginning of the design phase helped Empirehouse utilizes its Project Managers, Field Superintendents, and Glazing foreman to come up with an innovative on-site pre-glazing plan. Combining this expansion project with the existing Mystic Lake Casino Hotel makes it the second-largest in the Minneapolis-St.
Mystic Lake Center is a 70,000-square-foot event center and a 180-room hotel tower featuring 18 new suites with scenic views.